Translate Icon Traducir

PCL and Stantec Picked for Expansion of San Diego Plant to Deal With Tijuana Wastewater Flows

PCL and Stantec Picked for Expansion of San Diego Plant to Deal With Tijuana Wastewater Flows

PCL and Stantec Picked for Expansion of San Diego Plant to Deal With Tijuana Wastewater Flows

PCL Construction secures a $42-million progressive design-build contract to expand San Diego’s South Bay International Wastewater Treatment plant, the first contract in an overall $600 million project to treat wastewater flows that have been crossing the border with Mexico since 2022. 

Read the original post

Share :
Tags :